Heathrow Fuel Control System
Keeping the fuel flowing at Heathrow
Heathrow Airport required an upgrade and extensions to its aircraft fuel distribution system to keep pace with developments in existing terminals and with the future Terminal Five. Cougar Automation won the rigorous and competitive £200K contract to provide the substantial control systems upgrade for all of Heathrow’s fuel hydrants and for the airport tank farm serving Terminal 4. The successful first stage led to the placing of a further £300K order for similar system extensions to the other Terminals, including the tank farm that will serve the new Terminal 5. Cougar utilised Wonderware’s InTouch SCADA and real-time database Wonderware Historian supplied by SolutionsPT Ltd.
Aviation fuel is delivered to the tank farms by pipeline. The task of the control system is to sequence the tanks, record fuel quality control data, to control twenty large pumps to maintain constant pressure and to prove that the fuel hydrants have no leaks. The upgrade was required to improve the reliability and management of the system by replacing out-of-date hardware and rewriting the software. The existing hardware was passed its operable life and the software was not sufficiently structured for effective support.
Airport realities…
Airports are large places, and Heathrow is one of the largest. This produced particular instrumentation connectivity problems that had to be overcome. In the system a high volume of input data has to be collected from many remote outstations, the distance has to be overcome and data reliability is crucial. To ensure that the data is always available, each outstation communicates with dual-redundant modems. This was such a critical feature that Cougar simulated outstation plant and instrument behaviour in their laboratory prior to taking the solution to site.
“Keep it running…”
The airport had to keep working whilst the upgrade was in progress; this was a test of Cougar’s project management skills. The PLC backplanes were installed on site using temporary stands, each night the old configuration was disconnected and the new one installed, the system was then tested using the actual IO and then had to be restored prior to the first flight arriving early each morning. There was simply no question of having the system down.
Real-time architecture…
The original architecture of the Heathrow project consisted of three InTouch 7.0 SCADA nodes communicating via Modbus to Modicon 984 PLCs. The scope of the original contract awarded to Cougar included a requirement to upgrade these SCADA nodes and modify the system to communicate with Schneider Quantum PLCs.
Another requirement of the project was to improve the reliability of communications, for this reason the Wonderware OPC link application was utilised to allow InTouch to communicate with Schneider’s OPC Factory Server which provided an interface to the Quantum PLCs. In addition, Cougar developed scripting was added to the InTouch application to enable two of the SCADA nodes to operate in a Master/Standby mode thereby providing a backup communications path.
The system has a third “view only” node. All three SCADA’s run the same application, and are automatically updated each time a change is made to the Master (SCADA1)
The improved InTouch alarm system was also implemented and the Wonderware Historian real-time database server was added to efficiently log data for system analysis, audit and reporting purposes.
The project was a substantial and critical upgrade and extension to the existing scheme, the facility had to be fully functional throughout the installation and commissioning stage with a limited overnight window for access to the system.
Endorsement…
Jon Drapkin, of The Heathrow Hydrant Operating Company, said on completion of the project “Cougar Automation adopted a genuine partnership approach to our project and was an important element in the overall success of the scheme”.
Following successful installation Cougar was awarded a further contract to triple the size of the system to control two new pipeline receipt facilities and a large tank farm that will supply the existing fuel hydrant for Terminals 1, 2 and 3 and the new hydrant for Terminal 5.
Conclusion
The upgrade to the fuel system at Heathrow was completed under difficult project conditions. Operations had to continue and on-site work was limited to a short period each night. The use of Wonderware’s legendary ease-of-use products greatly assisted Cougar Automation whilst operating in this environment.
Cougar Automation Ltd
Go to external site: Cougar Automation
Cougar Automation is an ArchestrA Certified System Integrator
What they say...
"QI Analyst removes the stress from Quality Assurance"
Call us now
0161 495 4697
Request a Quote
Click here and we will get back to you as soon as possible.
Events / Webinar
Register for an event or download a topical webinar
Download Brochure
Either request a brochures or download them straight from our product pages